Hermitage Court

Two Grade A office buildings at the Hermitage Court Business Centre in Barming

Discover The Potential

Scroll For More

Sustainability was a key element of GDM Architect’s design for the project with both buildings targeting a BREEAM “Very Good” rating. To help achieve this, Encon Insulation supplied EcoTherm Eco-Versal to be installed as part of the floor build-ups in both buildings.

''Our aim at Hermitage Court was to deliver top class office space which was also more sustainable. We installed Eco-Versal as it provided the perfect combination of a straightforward product with strong thermal performance, backed by excellent technical support.

A spokesman from the Gallagher Group'' 

Eco-Versal delivers insulation performance for the lifetime of the building. When covered with a suitable floor covering, the boards are capable of resisting a uniformly distributed load of < 1.5 kN/m2 and a concentrated load of < 1.4 kN. The buildings included rag stone cladding sourced from Gallagher’s quarry situated adjacent to the business centre. The buildings have proved to be a success with Unit H pre-let to Havas Shared Services Limited.

 

Page Reviewed 28/07/25

Eco-Versal insulation board applied between the rafters
Eco-Versal insulation board applied to a wall
Eco-Versal insulation applied to a solid floor
ProductsEco-Therm Eco-Versal

EcoTherm Eco-Versal 5 in 1 solution insulation board with a thermal conductivity of 0.022 W/mK. It is suitable for a number of different applications, including cold flat and pitched roofs, floors and timber frame construction.  

 

Discover More

Duke of York's Royal Military School case study image

Duke of York’s Royal Military School

The Duke of York’s Royal Military School was established in 1803, learn more about its refurbishment

Case Study4 min read
Fullhurst Community College case study image

Fullhurst Community College

A new modular teaching block within the Fullhurst Community College regeneration project

Case Study4 min read
King Alfred's Academy external case study image

King Alfred’s Academy

King Alfred’s Academy opened its state-of-the-art science facilities in 2018

Case Study4 min read
Maritime Museum case study image

National Maritime Museum

Learn about the National Maritime Museum’s Exploration wing

Case Study4 min read

Start your project

Talk to us

Products used in this project

Find out more about the products used on this project below
5 in 1 insulation board.

Eco-Versal

5 in 1 insulation board.

Stay Updated
BACK TO TOP
Ecotherm Insulation
Contact us
Legal Information
Modern Slavery Act Statement
Website Privacy Policy
Cookie Policy
Terms and Conditions of Website Use
Gender Pay Gap

Kingspan Insulation Ltd — United Kingdom | ® EcoTherm is a Registered Trademark of the Kingspan Group plc