• U-value Calculator
  • Contact Us
  1. Ecotherm Insulation Home
  2. Case Studies
  3. Fullhurst Community College

Case Studies

Fullhurst Community College

A new modular teaching block within the Fullhurst Community College regeneration project

Discover The Potential

Scroll For More

As part of Leicester City Council’s school expansion plan, Willmott Dixon oversaw the £14 million build programme which improved the existing school facilities. The new school building included fully fitted out science labs, a music room, food technology facilities and a drama studio, all of which provided space for an additional 3,000 pupils.

''We installed EcoTherm Eco-Versal on this project as it is a cost-effective solution for achieving compliant thermal performance. EcoTherm Eco-Versal was put forward by us, as it was an open specification, through our trusted supply chain partner FGF Limited. In addition, it is also robust enough for installing as part of our system to create a solid walking platform.''

Louis Dewsbury, Contracts Director, Midlands Floor Screeding

Fullhurst Community College inside
Fullhurst Community College Reception
SECTOREducation
LOCATIONBraunstone, Leicester
ProductsEco-Versal

1,400 m2 of Ecotherm Eco-Versal was installed on ground floors throughout the school by Midlands Floor Screeding, beneath their Isocrete Fast K Screed flooring system.

The Installation

The rigid insulation board is faced with aluminium foil composite and can be used to insulate floors, walls, dormer cheeks and ceilings, achieving a thermal conductivity of 0.022 W/mK.

The boards ensured compliance with the guidance in Part L to the Building Regulations (England), which advised a minimum floor U-value of 0.18 W/m²K for non-domestic new builds. The lightweight Eco-Versal boards also allowed easy manual handling and could be simply cut to size with a fine-toothed saw. 

 

Page Reviewed 28/07/25

Eco-Versal

The 5 in 1 solution
Learn More

Discover More

Duke of York's Royal Military School case study image

Duke of York’s Royal Military School

The Duke of York’s Royal Military School was established in 1803, learn more about its refurbishment

Case Study4 min read
Hermitage Court external case study image

Hermitage Court

Learn more about the two Grade A office buildings at the Hermitage Court Business Centre in Barming

Case Study4 min read
Maritime Museum case study image

National Maritime Museum

Learn about the National Maritime Museum’s Exploration wing

Case Study4 min read
King Alfred's Academy external case study image

King Alfred’s Academy

King Alfred’s Academy opened its state-of-the-art science facilities in 2018

Case Study4 min read

Start your project

Talk to us

Products used in this project

Find out more about the products used on this project below
5 in 1 insulation board.

Eco-Versal

5 in 1 insulation board.

Stay Updated
BACK TO TOP
Ecotherm Insulation
Contact us
Legal Information
Modern Slavery Act Statement
Website Privacy Policy
Cookie Policy
Terms and Conditions of Website Use
Gender Pay Gap

Kingspan Insulation Ltd — United Kingdom | ® EcoTherm is a Registered Trademark of the Kingspan Group plc