EcoTherm prides itself on providing fuss free technical advice. It's aim is to provide simple to understand advice on anything from specification to installation including:
  • U-value calculations to show compliance with current Building Regulations/Standards for floors, walls and roofs (both flat and pitched) supported by a detailed report.
  • Condensation risk analysis: Using calculation methods set out in Appendix D of BS 5250, again supported by a detailed report.
  • Site visits (by appointment). Our technical sales team are available to provide on-site assistance and advice where necessary.
  • Advice on product selection and product data for all EcoTherm® Insulation products.
  • General application and fixing on all applications.
  • Specification advice.
  • Impartial product advice on associated products and proposed system elements.
  • Technical samples for compatibility testing.

U-Value Calculator
BIM
Building Regulations
FAQs

BIM

BIM stands for Building Information Modelling, and it is the new process of managing all of the information for a building. It takes on a cradle to grave approach meaning it is used from the initial concept of a design all the way through to the demolition of the building. By using the BIM process process it enables better collaboration between everyone involved with a project. 

EcoTherm Insulation's BIM objects are available to download free of charge. All object can be download a zip file containing Revvit & IFC formats from here.

UK Building Regulations & Standards

Building Regulations and Standards apply statutory requirements on building work in the UK for new and existing buildings. Not only do they provide building standards with regards to design, quality, sustainability and health and safety, but they keep the UK on track with its climate change commitments (targeting an 80% reduction in carbon emissions by 2050). Insulation plays a key part in meeting these requirements and it is important they are adhered to.

Supporting documents are available from the government that provide detailed information on each section of the Building Regulations and Standards. EcoTherm has compiled a summary of the insulation related elements of these documents and provided U-values that will help achieve compliance.

England
Wales
Scotland


The figures and information quoted are for guidance only.  Official Building Regulation / Standard documentation should always be consulted. Contact EcoTherm Technical Services for detailed U-value calculations and condensation risk analysis which should be completed for each project.

Did you know?
The fine for contravening Building Regulations / Standards can be up to £5000 and an additional £50 per day until the work is rectified to the correct standard. These fines usually apply to the builder or contractor, however, action can also be taken against the home or building owner who will be required to alter or remove the work. For work that does not meet Building Regulations or has not been rectified, local authorities can withhold completion certificates and the sub-standard work will appear on land search enquiries, affecting the sale of the property.

Unfortunately, there is no one simple answer to this question as it really depends on various key factors. Firstly, there’s the matter of where the insulation is going to be used in the building envelope, for example in a cavity wall or in a pitched or flat roof. You also need to consider which other building materials form part of this particular element (i.e. brickwork / blockwork in a wall, or tiles and plasterboard in a roof).  Cavity spaces will also have an effect on the insulation thickness. At EcoTherm®, our technical team is always happy to advise on this important aspect of specification.

Typically for floors, we would recommend using a board that exceeds 140KPa when tested to BS EN 826: 1996, our Eco-Versal and Eco-UFH boards are ideal for this application.

For flat roofing single ply applications then 150KPa is required.  All our flat roof range of boards exceed this figure.

At a time when there is a universal call for increased effort to protect the environment, it’s important to check that the insulation boards you buy are manufactured from CFC and HCFC free grades of raw materials which ensure zero Ozone Depletion Potential (Zero ODP). EcoTherm® boards possess both of these qualities and also have a low Global Warming Potential (GWP).  All EcoTherm PIR rigid insulation products correspond to the BRE Global Green Guide generic specification which achieves a summary rating of A on tissue facing products and A+ on foil facing ones.

Additionally, EcoTherm holds ISO14001 certification, as do our two main raw material suppliers enabling increased credits for a BREEAM assessment.

Insulation itself does not have a specific U-value, as this is based on the different building construction elements i.e. wall, floor or roof.

Call us to determine the correct thickness of EcoTherm insulation to achieve your target U-value that complies with Building Regulations. We will then produce a U-value calculation for you (including condensation risk analysis if required) to show your Building Control Officer that you comply.

They can be cut with a sharp knife or a fine toothed saw. As a responsible company, we recommend that users take a sensible approach to the cutting of boards with strict regard for health, safety and environmental standards. Eye protection should be worn when cutting boards. Cutting with power tools generates dust so should be kept to a minimum. Operations which produce dust should be carried out in well ventilated conditions and where possible an appropriate dust mask should be worn.
For our boards, we recommend that for a long duration of extreme temperatures then -50°C to +110°C are not exceeded.
If the PIR board has been correctly applied then it has an indefinite life and will deliver design insulation values for the lifetime of the building. However this does, of course, depend upon the method of application, supporting structure and conditions of use.
Yes, and EcoTherm Eco-Versal is ideal for this application. We recommend placing a sheet of polythene (1000 gauge / 0.25 mm) over the insulation before pouring your screed. This will protect the foil surface of the insulation from the alkalinity / dampness of the screed and prevents it entering the joints between the boards.

If using a wet under floor heating system the Eco-UFH is ideal. The unique facing is gridded and meshed and speed up the installation process.
Possibly - if external wall insulation is being considered, you should contact the render manufacturer for recommendations on what insulation products are approved for the system.
Dry your boards before using them by natural means only. Do not use direct heat, such as a naked flame to dry the boards. Do not lay the boards in temperatures of less than 5°C as condensation may occur. If work is interrupted, the laid boards must be protected to prevent water penetration. Store the boards in a flat, dry area clear off the ground and away from sources of mechanical damage or ignition. Boards should be completely covered with waterproof sheeting if stored outside.
No, EcoTherm flat roofing insulation boards should always be protected under a waterproof layer and therefore would be unsuitable for an inverted flat roof application.
EcoTherm PIR insulation boards are rigid in nature and a closed cell material, meaning water absorption is minimised.

The Department for Communities and Local Government (CLG) recommend the use of closed cell insulation materials in their guidance document “Improving the Flood Performance of New Buildings” due to the materials' ability to recover from the effects of water immersion and to return to the expected level of thermal performance as soon as possible after the water has subsided:

Wall Insulation: "Cavity insulation should preferably incorporate rigid closed cell materials as these retain integrity and have low moisture take-up. Other common types, such as mineral fibre batts, are not generally recommended as they can remain wet several months after exposure to flood water which slows down the wall drying process. Blown-in insulation can slump due to excessive moisture uptake, and some types can retain high levels of moisture for long periods of time (under natural drying conditions)."

Floor Insulation: "Water will lower the insulation properties of some insulation materials. Floor insulation should be of the closed-cell type to minimise the impact of flood water...It is recommended that insulation be placed above the floor slab (and underneath the floor finish) rather than below would minimise the effect of flood water on the insulation properties and be more easily replaced, if needed."

The full CLG guidance document can be downloaded at http://www.planningportal.gov.uk/uploads/br/flood_performance.pdf
If electrical cables are installed in contact with the insulation there should be no detrimental effect to the PVC coatings of the cables, whereas other types of insulation may cause issues. Always consult a qualified electrician when any electrical work is to be carried out.

Our Technical Services are a friendly team provide a prompt, unrivalled, free of charge service answering the most basic questions to complicated in-depth queries.

Discuss your project with us
We use cookies on our website www.ecotherm.co.uk. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click “Accept and close” to accept the use of cookies on our website. If you do not click “Accept and close” but continue to use this website: you thereby consent to the use of all EcoTherm Insulation cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.