CaseStudy_DukeofYork_Eco-Versa_01_UK_EcoTherm

Duke of York’s Royal Military School

Established in 1803, the Duke of York’s Royal Military School has a long and prestigious list of alumni from generals to sportsmen. To keep the school on top for years to come, a range of new buildings have now been constructed featuring EcoTherm Eco-Versal in both roof and wall applications.

The Project

Following its transition to an Academy in 2010, the Royal Military School expanded entry to civilian families for the first time. In order to provide an additional 250 student spaces, the existing school buildings were refurbished and expanded. A further seven additional blocks were built by main contractors BAM Construction, including two new two-storey teaching blocks; junior dormitories and a state of the art sports hall.

Product:
Eco-Versal
Location:
Dover
Contractor:
Roe Timberframe Ltd
Contractor:
Charles Bates Roofing Ltd

At the double

CaseStudy_DukeofYork_Eco-Versa_02_UK_EcoTherm
The new teaching and junior boarding blocks feature a pitched roof design which is sensitive to the surrounding listed architecture. To insulate the roofs Charles Bates Roofing Ltd installed EcoTherm Eco-Versal. Fitted between and over the roof battens, Eco-Versal provided a lightweight insulation solution which was easy to handle and could be cut to fit simply and quickly with a hand saw or sharp knife.

Faced with aluminium foil composite, EcoTherm Eco-Versal is a versatile rigid insulation board and can also be used on floors, walls, dormer cheeks and ceilings. With a thermal conductivity of 0.022W/mK, the product helped to reduce the build-up thickness required to achieve a compliant U-value. EcoTherm Eco-Versal also helped contribute towards the building’s interim BREEAM rating of ‘Very Good’ with a BRE Green Guide generic PIR insulation rating of A. 

Roe Timberframe Ltd used EcoTherm Eco-Versal within the wall panels of their structural timber frame buildings, which were then clad by Roe Brickwork Ltd with brick facades to the teaching and dormitory buildings.

In addition to providing new education facilities such as a “super science laboratory”, the new master plan from architects Scott Brownrigg also included the demolition of several badly worn 1960’s teaching blocks, greatly improving the setting for the historic school buildings. 

Photography credit: Duke of York’s Military Academy / BAM
EcoTherm Eco-Versal provided the thermal performance we required with a slim insulation thickness. This allowed the boards to be easily and quickly factory fitted in the timber frame wall panels.
Dave MacMillan, Sales Director for Roe

Related products

EcoTherm Insulation Ltd

Harvey Road

Burnt Mills Industrial Estate

Basildon

Essex

SS13 1QJ

01268 591155

We use cookies on our website www.ecotherm.co.uk. To find out more about the cookies we use, or to change your cookie preferences i.e. to remove your consent to our use of certain categories of cookies, please visit our Cookie Policy & Control page.

Please click “Accept and close” to accept the use of cookies on our website. If you do not click “Accept and close” but continue to use this website: you thereby consent to the use of all EcoTherm Insulation cookies and third party cookies for the purposes of improving performance, improving functionality and audience measurement, in accordance with the terms laid out in our Cookie Policy & Control page; and we will assume that you have read and understood our Cookie Policy & Control page.